Dormal, G. 1981. A power station could be built that uses a pass out turbo-generator comprising a condensing station. Such a design was used for the Zuenoula factory, on the Ivory Coast, started up in 1980. This paper gives an idea of the technical solution adopted to be able to respond to the very large variations in the energy requirements of the complex both for steam and electricity. Energy in a Cane Sugar Complex: An Original Technical Solution for its Most Efficient Use. Sugar Journal, November 1981:5-8.